Suburban Homes Construction Project Suburban Home
Continuing with the Suburban Homes Construction Project case study found at the end of chapter 6 (and reviewing previous chapters 1 through 5), CPM 4e, complete the following:
(20 points) Stakeholder identification and prioritization matrix (Exhibit 6-2)
(20 points) Stakeholder Matrix (Exhibit 6-4)
(20 points) Stakeholder Engagement Matrix (Exhibit 6-5)
(20 points) Communication Matrix (Exhibit 6-9)
(20 points) Mechanics
You will be assessed on content and mechanics.
Content (80 points): The content must be based on the case study materials and reading assignments. The PMBOK 6e and CPM 4e, along with other reputable resources can be used to supplement the responses through summarizing, paraphrasing and quoting those sources. Each matrix should be followed by a discussion of the matrix and how to use/interpret it.
Mechanics (20 points): The total assignment length should be at least 3 pages, not to exceed 4 pages and need to follow APA guidelines. You should review the assignment rubric in Moodle to ensure that you address all aspects of each component to this assignment.
Stakeholder ID and Priority Matrix (Exhibit 6-2) |
An ID and prioritization matrix includes at least 5 relevant stakeholders and rates them for power, interest, etc.
20points
|
At least 5 relevant stakeholders with some minor errors in prioritization scores based on the SHCP.
17points
|
Less than 5 relevant stakeholders and/or some major errors in prioritization scores based on the SHCP.
14points
|
No submitted
0points
|
|
Stakeholder Matrix (Exhibit 6-4) |
A stakeholder matrix includes at least 5 relevant stakeholders and explains their potential interests and necessary support/mitigation strategies
20points
|
A stakeholder matrix includes at least 5 relevant stakeholders but the explanations are not as complete as they could be.
17points
|
More details are clearly needed and/or less than 5 stakeholders are identified.
14points
|
Not submitted
0points
|
|
Stakeholder Engagement Matrix (Exhibit 6-5) |
A matrix includes at least 5 relevant stakeholders with all matrix aspects fully completed and a engagement strategy that makes sense for the type of stakeholder
20points
|
A matrix includes at lest 5 relevant stakeholders but the positions, barriers to change or strategy are not sufficient or have minor errors
17points
|
More details are clearly needed and/or less than 5 stakeholders are included in the matrix.
14points
|
Not submitted
0points
|
|
Communication Matrix (Exhibit 6-9) |
A matrix including at least 5 relevant stakeholders with communication needs and other information relevant to the type of stakeholder and previous assessment.
20points
|
A matrix including at least 5 relevant stakeholders with some errors or omissions in the matrix making it less useful as a tool.
17points
|
More details are clearly needed and/or less than 5 stakeholders are identified.
14points
|
Not submitted
0points
|
|
Mechanics |
Materials submitted fully comply with mechanics requirements in assignment
20points
|
Materials submitted do not fully comply due to some minor errors
17points
|
Materials submitted do not resemble the mechanics requirements, but some effort was made.
10points
|
Not submitted
0points
|
|