Which stakeholders should be included in the strategic planning process
Course Project: Developing a Strategic Plan
This project: you continue to refine the summary and engage in a SWOT analysis related to the identified unmet need.
Section 1: Summary of the Issue
As introduced in Week 6,continue to develop, write, and refine a 2- to 3-page summary of the issue you are addressing through the creation of a strategic plan. (Refer to Week 6 for the preparatory instructions as necessary).
To complete:
Create a 2- to 3-page summary of the issue, in which you identify and/or describe:
The unmet need and how it is evident in the specific group, unit, or organization
The mission, vision, and values of the group, unit, or organization
Background, including:
Data from historical analysis and forecasting
Evidence from the literature
What has been attempted in the past by various individuals and groups to address this need
Which stakeholders should be included in the strategic planning process
Initial vision for addressing this need at the institutional or systems level, including at least one strategic goal
Broader issues to be considered
Section 2: SWOT Analysis
Conducting a SWOT analysis can have tremendous value in preparing for planned change.To prepare:
Conduct a SWOT analysis for your Course Project, incorporating any insights you have gained from this week’s Discussion. Identify two strengths, two weaknesses, two opportunities, and two threats that warrant attention relative to the identified unmet need.
Reflect on how you distinguished between weaknesses and threats and consider whether the threats or weaknesses also pose opportunities.
To complete:Write a 2- to 3-page summary that conveys the results of your SWOT analysis. Include:
Two strengths
Two weaknesses
Two opportunities
Two threats
An explanation of whether the threats or weaknesses also pose opportunities
By Day 3
Submit:
Section 1: Summary of the Issue (3–4 pages)ecxluding reference and title page for all assignments.
Section 2: SWOT Analysis (3–4 pages)